Johnny Tian’s Status Report Mar. 9th

Accomplishment of This Week

  1. status report (7h)
    • Design Trade Off for turn signals.
    • System Implementation for enclosure and turn signals.
    • Section 7 test and verification.
    • Part of section 8 project management.
  2. Radar Cad enclosure design (5h)
    • Decided to go with polyurethane foam over polycarborate or abs board – radar have a very specific requirement for the thickness and density of the radome (cover for the radar). Off shelf sheets often don’t have required thickness for the cover and 3d printing abs will not provide a uniform density. Hence, the best option is to use polyurethane foam which is practically invisable to radar.
    • Image See below

Schedule 

  1. Design Review (DONE)
  2. First iteration CAD  Design (Partial Finish)

Plan for Next Week 

  1. Cad Turn signals
  2. Cad Turn switches
  3. Cad main section.