This week I, like the rest of my team, spent a large amount of time working on the design review report and presentation. In addition to contributing by writing slides and sections of the paper, I am formatting the final Word document for our report. As part of finalizing the design for our project, I constructed an image bank consisting of ten increasingly complex images which we will be using to test our project. The image bank is as follows:

 

I also updated our block diagram to clarify the way components interact with each other. As mentioned in the team status report, a mistake on the team’s end caused us to put the wrong order through for the Raspberry Pi, so I was unable to experiment with controlling the motors we received through the Pi. When we realized the mistake, I found the parts online that we needed to order, which included the Pi itself, a power adapter, and a microSD card and its adapter, and placed the orders for it. Although I was unable to work directly with the Pi, I started to use and experiment with the libraries to control the motors, but currently have no way to actually test out any code I write. As a result, my progress is behind schedule. To catch up, I am preparing code this week and next week which will be ready to be tested immediately once our Pi actually arrives. In the next week, I hope to complete the preliminary code for controlling the motors through the Pi, as well as finish up work on the design review report and finalize the format for it.

Leave a Reply

Your email address will not be published. Required fields are marked *