Team Status Report for 4/4/26

After completing the interim demo, we are finishing up the major development portion of our project and moving primarily into testing and verification. The main parts of the project we still need to include are the force-sensitive resistor (FSR) to simulate a pen writing when pressure is applied, and our optical flow sensor, which should be ready integrate with our new PCB.

For testing and verification, our primary tests to run are for latency, accuracy, battery, and weight + housing. For latency, we will have timing modules as data moves through our system, with end-to-end and round-time travel measured. Housing & weight will be gathered from user feedback during and outside of lab time. Once we have finished incorporating the (FSR) and optical sensor, we will conduct writing sessions to measure battery. We should be in a good place to incorporate any feedback from stakeholders.