Kushagra’s Status Report for 04/24/21

  • Started integration test. Currently, we have been able to take pictures from the cameras, and pass them along to the algorithms and get a final result.
  • Almost done with servo + shield (should have the system running by monday). After which, we will have full system integrated (i.e from taking picture to controlling gate via the jetson nano). This is the next major step for me.

Leave a Reply

Your email address will not be published. Required fields are marked *