Hongzhe’s Status Report on 11/11/2023

For this week, we were able to demonstrate our work in the interim demo to the staff member and show some of our progress. Given that we started late, I believe our team has made great efforts up until now. 

Personally, I achieved the following. Given the precious feedback from Professor Tamal, we found the bug where we were not capturing the angle for wrists. I was able to find the support for OpenPose on hand posture processing and update the backend model with Shiheng together to fix the issue. In order to do that, I also reprocessed all the reference dataset for future usage. At the same time, since OpenPose serves right in between the front and back end, I am now in charge of integration. I was able to integrate the real-time pipeline such that after hitting the capture button, the user image would be saved and the back end comparison procedure is called.

For the future weeks, I will keep integrating changes and parameters that go between the front and back end. Just to mention here that I will mostly work on integration on the real-time pipeline and Jerry would control his own.

ABET: Tests that I have created include Full back end functionality test and OpenPose functionality test. Basically the ones shown in interim demo.

Tests to be implemented particularly for my work would be the following (related to OpenPose and integration – full pipeline):

  1. Full pipeline functionality test: to test that the integration works fine and front and back ends are well connected
  2. OpenPose performance test: to see how much processing time is taken by OpenPose
  3. User Latency Test: to obtain the latency from the second data is captured from camera to when user first get verbal/visual feedback