Mehar’s Status Update for 10/22

The week before break, most of my time was spent working on the design report – I researched further into feature descriptor-based object detection and did compiled my benchmark results for the report. In the report, I was responsible for the computer vision trade studies and design implementation sections, the introduction, schedule and team member responsibility sections. This overall was about 9+ hours of work.

Beyond this, during the break I started implementing the preprocessing and overall code structure of our project to integrate the preprocessing/model/postprocessing sections.  This took about 3-4 hours to research and formulate overall.