Progess:
Worked with Jiaqi on the manufacture design of the physical IR Man device
Finished design presentation
Finished the initial webapp structure, added routes for user authentication, devices and control panel
Finished webapp server to RPi connection on localhost
Finished user press button on interface, information sent back to web app server, commands sent to RPi pipeline
Schedule:
I am right on schedule, with the main structure of the webapp server almost finished and the webapp server to RPi connection all set up. I should be able to finish the webapp very early on.
Deliverable next week:
fill up the webapp server database with different brands and devices(need to write a script to import data from the external database)
0 Comments