This week I focused on the final presentation, building out the slides, prepping my delivery since I’m the presenter, and double-checking every number in the deck against our raw data to make sure nothing is off.
We’re on schedule. All results are under threshold: 2.1 km median position error (target 10 km), 0.32 px reprojection error, 500 μs time sync (target 50 ms), 4.5 W power draw (target 10 W). Only two things left: the moored balloon experiment and demo day!
