Accomplished:
I let Jim and Charlie measure the chip that I fabbed last week and provide direction on specific parameters that I need to continue my fabrication process. They took those measurements and have provided me with direction for improvement for our next iteration. I have since modified the design and begun the fabrication process of the next iteration.
Progress/Schedule:
We are still recovering from the two weeks of lost in time as I’m not certain how many iteration it would take for us to get the chip starts to oscillate, there are many unknown variables from the fabrication stand point that really asks for multiple iterations, but I’m on track to deliver two more iterations based on the time remaining.
Upcoming Deliverables:
I’ll finish up the devices by wednesday before the spring carnival before I take a break and leave Pittsburgh, in the meantime, Charlie and Jim can work on measuring the devices so I can get ready to modify things for the next iteration immediately after I come back.