Progress:
This week, our team continued transitioning from early device characterization into the oscillator integration and implementation phase of the project. Building on the first-pass fabrication and measurement results from the prior week, we spent time refining how those results should inform the oscillator design direction, expected operating behavior, and the supporting test infrastructure. In particular, the measured NMOS, resistor, and MOSCAP data from the first iteration helped give us a more realistic understanding of the practical device constraints that the oscillator design must satisfy.
At the same time, progress was made on the supporting hardware side through continued drafting of the test bench PCB and preparation for eventual oscillator bring-up. This helps position the team to move more quickly once the final oscillator design is locked. Overall, this week was less about generating major new measurement results and more about using what we learned from first-iteration characterization to support the next design step.
Schedule/Updates:
At the team level, we are currently about one to two weeks behind schedule due to delays in finalizing the oscillator design and implementation. While characterization results from the first iteration have provided useful guidance and helped narrow the design space, the project is still waiting on the oscillator design to be completed before several downstream tasks can fully proceed. In particular, finalization of the test bench PCB, oscillator integration planning, and follow-on demo infrastructure all depend on having the oscillator design available and understanding its expected operating range and behavior.
At this point, the main path to recovering schedule is to finalize the oscillator design as soon as possible and then move quickly on integration, PCB completion, and fabrication-related next steps. In the meantime, the team has been using the available time to prepare supporting infrastructure and reduce as much downstream delay as possible once the oscillator is ready.
Upcoming Deliverables:
Next week, the team’s highest priority is to finalize a viable oscillator design and begin translating that design into concrete implementation and testing steps. This includes incorporating the finalized oscillator into the test bench PCB, completing the PCB design so it can be ordered on time, and preparing for the next phase of bring-up and characterization.
In parallel, the team also needs to continue preparing for the interim design milestone, which is now only a few weeks away. If early oscillator performance data becomes available soon enough, we also want to begin using those results to inform demo PCB planning and broader system integration decisions. Overall, the main deliverable for next week is to lock the oscillator direction and convert the current characterization-informed planning into concrete hardware progress, such as in finalizing and ordering the test PCB.