This week was probably the most productive week that we as a team have had, mainly because we got out final product probably 95% working. …
This week we got a lot of integration work done, and nearly have an MVP (we just need to do some more testing). What I’ve…
These past few weeks have been very eventful. Since the last status report, the motors weren’t turning even though we couldn’t figure out what was…
This week was a little of a lighter week for me in terms of things I needed to do to get ready for the interim…
This week, I retested and finalized the LEDs and temperature sensor work I had done last week. I made sure that the temperature sensor was…
These past weeks since the last status report have been very productive. Firstly, we all met as a team and had hot pot one more…
This week, I worked a lot on the actual design report, since that is due next week. Last week when we were working on the…
This week, I worked mainly on getting the design slides together, and I worked a little on the report aspect as well (see the design…
This week, I did a lot of research into the kind of technology we will use for our project. I looked into the benefits of…
This week I focused mainly on working on our proposal presentation and getting the website set up (see the proposal slides page for more details…