Brian Bakerman (4/22)

This week I worked on arduino communication between our different working modules. This week was largely a team effort with regards to debugging the arduino code and making sure that the logic of the system and intercommunication worked properly. Next week I plan on helping with final logic tweaks of Read more…

David Murray (Week of 4/8)

David This week I worked ordered the PCBs for the TP sensor and TX/RX boards. Given that it is Carnival and we are waiting on parts, that is the extent of what is productive for my tasks. I have also begun to think about the TP sensor demo mounting. It Read more…

David Murray (Week of 3/25)

This week I worked finalized the TP load sensor integration with the rotation sensor. The system uses an acrylic piece mounted inside the TP tube to trigger a contact switch mounted on the end of the TP axis. This triggers the start of a “wiping session” in the code, telling the Read more…

James Gualtieri (Week of 2/18)

James Gualtieri Team B1 Individual status report For the week of 2/18, my status continued to develop the standards necessary for our finalized design block diagram, working on the final design presentation, as well engaging in some CAD for the toilet paper sensor The results for the toilet paper sensor Read more…