Brian Bakerman (4/22)

This week I worked on arduino communication between our different working modules. This week was largely a team effort with regards to debugging the arduino code and making sure that the logic of the system and intercommunication worked properly. Next week I plan on helping with final logic tweaks of Read more…

4/22 James Gualtieri

This week, the entire team was in full build mode for the in class demo. I worked primarily with the control of the main hub using the raspberry pi as well as with David to help complete the work of the RF communication between devices. In addition, we have worked Read more…

David (Week of 4/22)

This week was the in-lab demo before the final presentation. The demo went well, all of the functionality we designed in the revised project was working properly. The remainder of the week has been spent working on the final presentation and poster, as well as preparing for the final presentation Read more…

James Gualtieri Week of 4/15

The majority of my progress for this week was working with the team for the in lab demo. I reconfigured the data upload software to work with multiple serial streams at once from the raspberry pi. The team should be in decent shape to demo a MVP on Monday.

James Gualtieri Week of 4/8

Sorry for the delay on this post, but this past week has been a busy one for me outside the scope of this class. Ass for project updates, we’re currently in the phase of the project where testing and verification is our main focus as we our confident in the Read more…

Brian Bakerman (week of 4/8)

This week I worked on thinking about data metrics and talked to a few people about their thoughts as well. James and I agreed on what data he would be logging for me, so I started on the frontend implementation. Next week I intend on continuing that implementation.

David Murray (Week of 4/8)

David This week I worked ordered the PCBs for the TP sensor and TX/RX boards. Given that it is Carnival and we are waiting on parts, that is the extent of what is productive for my tasks. I have also begun to think about the TP sensor demo mounting. It Read more…

James Gualtieri 4/1 Status Report

This week I worked on the RF redesign of the wireless communication for the sensor system interaction. Since the parts came later than we would have hoped for I’m not 100% happy with the progress I’ve made at the time of writing this report but am confident the system will Read more…