Worked on Introduction, Architecture, and Design Requirements as part of the design report. We now have a concrete plan for testing and have put into words the design and implementation of the parts we glossed over during our presentations.
We will be moving forward with our plan to set up the gantry movement to software connection alongside the first runs of the CV for piece tracking.
