Felipe Status Report for 2/21/2026

The main bulk of this weeks work was preparing for the design review presentation I gave on Monday and then incorporating feedback into the design review paper due in a weeks time.  This also represents the main deliverable that will be worked on in the coming week.

Despite spending most of my time this week focusing on the design presentation, I also was able to spend some time into setting up resources for the companion app.  I added my teammates to a GitHub repository that allows them to view and interact with the flutter/dart code that makes up the companion app.

In terms of scheduling I feel mostly on pace.  In the design review I included sketches of what the app UI will look like and have reviewed the material library to ensure that it is possible to build with the dart libraries I have selected for use.  Once the design review document is finished I feel comfortable in starting work building the application in full.