Kaitlyn’s Status Report for 3/7/2026

What did you personally accomplish this week on the project?

  • Completed my assigned portions of the design report
    • “Mobile App” subsections in use-case requirements, design requirements, design trade studies, system implementation, and testing/validation
    • Project Management section, including bill of materials table
    • Updated system block diagram figure with connections (ie. I2C, AC)
  • Preliminary outline for UI changes I will make when developing frontend
    • Based on feedback from Prof. Orta-Martinez (ie. only one foot can be analyzed at a time) + our own system adjustments

Is your progress on schedule or behind? If you are behind, what actions will be taken to catch up to the project schedule?

My progress is behind we did not anticipate the design report taking up all of our work time this week. My initial plan was to finish up the report earlier in the week, so I (or we) could spend the remaining days leading up to break on integrating FPA with IMU and updating UI. However, luckily we have accounted for this in our slack time so we still have the opportunity to catch up this coming week. And as Lakshmi mentioned, we should be able to conduct our system testing in parallel saving us some time in the future.

What deliverables do you hope to accomplish in the next week?

(Note that some of these deliverables are the same as last week’s since I was only able to fully complete the design report):

  • Integrate FPA code onto the mobile app backend
  • Add the 3 pages mentioned above (current session, session history, analytics)
    • Focus particularly on FPA UI: regardless of if FPA is properly being measured, the “visuals” should be added to the frontend
  • As an added measure, I will collaborate closely with Lakshmi this week to understand her progress on FPA measurement accuracy/gait detection to ensure the mobile app is properly aligned with the hardware