Twain’s Status Report for 2024/02/17

This week, I spent significant time working on the slideshow presentation for the design presentation. I also helped create the list of parts we needed to order, and then submitted all of the ordering paperwork and dealt with the issues that arose in the order. Additionally, I helped Gary with the firmware for the GPS, looking at Rust crates for parsing NMEA 0183.

My progress is on schedule, assuming that the parts needed to test the energy harvesting show up quickly enough for me to get to prototyping, which is my main task for next week. I will need to figure out how to cut the metal, make it safe to wear, and attach it to the wristwatch strap and the piezo tiles to the metal.

Leave a Reply

Your email address will not be published. Required fields are marked *