Team Status Report for Mar 25

  • What are the most significant risks that could jeopardize the success of the project? How are these risks being managed? What contingency plans are ready?

The most significant risk right now is the integration for the interim demo. Since the basic functionalities of the synthesizer and the tracking program have been implemented, we will start early and integrate these two parts next week. However, if there are some issues with python libraries, we will work to support either Windows or macOS first and make both compatible after the interim demo.

  • Were any changes made to the existing design of the system? Why was this change necessary, what costs does the change incur, and how will these costs be mitigated going forward?

There were no changes to the existing design of the system.

  • Provide an updated schedule if changes have occurred.

So far there is no change to our current schedule. However, depending on the integration task next week, our schedule might get changed.

  • Component you got working.

The gyroscope chip can now control the synthesizer’s volume as well as bend its pitch. Here’s a demo video.