Team Status Report for 2/25/2023

What are the most significant risks that could jeopardize the success of the project? How are these risks being managed? What contingency plans are ready?

Were any changes made to the existing design of the system (requirements, block diagram, system spec, etc)? Why was this change necessary, what costs does the change incur, and how will these costs be mitigated going forward?

Since last sunday, we developed the block diagram, design requirements, and system specification for our new project for the design review presentation. Some of the changes we made are stated in the slides:

We were also considering making a change from the STM32 to another micro-controller. Details on this will be discussed today.

Please discuss teaming with your team.. and, please enumerate how you have adjusted your team work assignments to fill in gaps related to either new design challenges or team shortfalls (e.g. a team member missing a deadline).

Since we changed our entire project last week, we made significant changes to our team work assignments to account for these changes:

Nish: Pressure Thresholding, Xcode + Kivy Interface

Caroline: PCB and Glove Design

Lee: CV processing

Testing and verification remained the same