Spandan’s Status Report for 04/02

This week was very productive. In a nutshell, I aided in the construction of the mat and mostly completed the menu screen.

For the mat, as my teammates worked on ensuring the circuit was compatible with our game screens, I added padding using EVA foam to each of the wooden squares that we will be using to make the buttons of the mat. I also aided in testing of the mat.

Additionally, as stated in my previous status report, I worked on the menu screen and have attained 90% of its completion. After taking help from our TA Joseph and fixing some bugs, I am able to make the rectangles transparent based on how far they’re in the menu selection. An image of the same is attached below:

The only thing remaining is displaying high scores based on the song selection but I plan to do it when both my menu screen and Caio’s game screens are integrated. For now, I am uptown speed with our timeline.

Leave a Reply

Your email address will not be published. Required fields are marked *