Team Status Report for 3/6/21

This week, we mainly focused on the interfaces between our modules and their internal structure in preparation for the design review. We defined what the MMIO interface will look like for our project, though the syscall interface is still a work in progress. We also generated block diagrams for all of the FPGA components of our system.

We’ve also made some major shifts in the general structure of our project. In particular, we will no longer be building a custom kernel for our FPGA. This decision was made for a few reasons. First, it negates a significant amount of risk involved in bringing up our system, as creating the kernel ourselves would have pushed back a large amount of testing. Second, it removes a large burden from us, and gives us time to create a full game to demo the functionality of our system. Finally, it allows us to easily provide the user with the full C standard. Note that this decision means our system call interface is actually now a kernel module interface.

Finally, in light of these changes and what actually was accomplished this week, our schedule has been drastically changed. The details of these changes are below. Under these new changes, we’re right on schedule and expect to be able to maintain this schedule without causing excess stress for either of us.

Schedule Changes:

  • Removed Kernel-related tasks from Schedule. We intend to use a customizable Linux kernel instead.
  • Added CPU task for development of the test game before interim demo.
  • Removed PPU tasks for foreground scrolling and layering for foreground and sprites. The foreground tile engine is a copy-paste of the background tile engine. Layering will be accomplished with the sprite engine implementation.
  • Added another task to the PPU called DRAM Tile Fetch. This task will consist of implementing the Avalon MM Master on the PPU side to fetch tile data from DRAM.
  • Moved back input-related tasks. Andrew made good progress this week and we should be able to complete it earlier now.
  • Pushed back audio tasks by two weeks to make room for input tasks.
  • Pushed back implementation deadline of the PPU driver to until after the main PPU tasks are finished. Realistically, the PPU driver will be worked on in parallel with all of the PPU tasks for testing purposes.

Our updated Gantt Chart schedule can be found below:
http://course.ece.cmu.edu/~ece500/projects/s21-teamc1/wp-content/uploads/sites/133/2021/03/Project-Schedule-Gantt-Chart-Updated-3-6-2021.pdf

Our MMIO notes from Wednesday have been uploaded below:
http://course.ece.cmu.edu/~ece500/projects/s21-teamc1/wp-content/uploads/sites/133/2021/03/Communications-Updated-3-6-21.pdf

Our PPU diagram from Saturday:
PPU Diagram