Team Status Update for 03/28/2020

This week, all our team members have our own separate tasks.

We currently have no significant risks. Some minor risks include warping of the point cloud by the mesh triangulation algorithm, which may make it difficult to meet our originally proposed accuracy requirements. Another risk is that if we choose to go down the path of developing a web application for the demo, there may be some connectivity/load issues. To alleviate this risk we may prepare a demo video in case.

There were no changes made to the existing design of the system from last week.

Below is the updated Gantt Chart with physical component related tasks removed.
https://docs.google.com/spreadsheets/d/1GGzn30sgRvBdlpad1TIZRK-Fq__RTBgIKN7kDVB3IlI/edit#gid=1867312600