Team Status Report 4/18/20

  • Updated timer to be consistent with global python time function
  • Updated path planning code in cooperative case to incorporate chains
    • Minimize following distance in the cooperative case
  • Included other statistics in output file (i.e. average velocity, acceleration, deceleration, waiting time, etc)
  • Worked on merge functionality for 2 lane track before focusing objective towards optimizing figure-8 track (no longer doing the 2 lane though)
  • Change the weighting in the path planning algorithm
  • Run test cases to collect results for each case
  • Fix bug for vehicles in both tracks in the intersection