April 13: Team Status Update

  • What are the most significant risks that could jeopardize the success of the project? How are these risks being managed? What contingency plans are ready?

We are worried about not having enough time to do testing on the full system. We have already cut away at unnecessary improvements such as optimizing the ML algorithm for the Jetson.

  • Were any changes made to the existing design of the system (requirements, block diagram, system spec, etc)? Why was this change necessary, what costs does the change incur, and how will these costs be mitigated going forward?

No changes.

  • Provide an updated schedule if changes have occurred.