Israel’s Status Report For 12.9.23

Tasks completed

Completed installing the components on board and proceeded on testing, Finalized communication and integration with Hang for Advice polling and sending game state.  Troubleshooted Arduino code as well as photo resistors for each of the segments in our board, integrating buttons into the board.

Progress status

Made large progress as I needed to start fresh on board development 9×9. Became behind schedule and still slightly so as I expected to have the board perfected by Thursday.

Tasks to complete

Finalize the testing of our board: tweaking the threshold values and perfecting the game state interpretation. Also in the process of redeploying some components as short circuiting as made them faulty.

Team Status Report For 11.11.23

A hardware risk we have is being able to solder all the vector boards in a timely fashion. Even with the components we have, we are still waiting on more sensors and resistors to be received. Due to this long wait, we will have Hang develop vector board soldering to speed the process once the parts arrive.

 

A software risk is the integration between the hardware and software. Currently the board hasn’t been finished, so there’s no way of testing the communication between the board and the web application. To mitigate this risk, Hang will spend some time helping Israel with the construction of the physical board.

 

No changes were made to the existing designs of the hardware, software, or go engine.

Here is our current updated schedule:

11.11.23 schedule