(12/4) Team Weekly Status Update

(12/4) Team Weekly Status Update

This week we showed our final demo which included our MVP product that showed a user’s wearable device turn on with a light whenever it was their turn to do a task and the button which would rotate the task order for when someone finished 

(12/4) Weekly Status Update: Jeffrey

(12/4) Weekly Status Update: Jeffrey

This week we worked on building our final product from our MVP. I traveled back to home (Florida) from Pittsburgh, but I was able to access the Raspberry Pi remotely to work on the integration. I was in charge of getting our location detection working. 

(11/22) Team Weekly Status Update

(11/22) Team Weekly Status Update

This week, we were able to add more functionality to our hub by making it be able to perform bilateration to understand the location of the wearables. On top of that, Jeffrey also made the hub more robust and debugged the message passing interface between 

(11/22) Weekly Status Update: Jeffrey

(11/22) Weekly Status Update: Jeffrey

This week I continued to try to get our MVP working. I started making the hub code more robust and continued to debug the message passing interface between the hub, wearable device, and the button. I also started to finalize our location detection method with 

(11/15) Team Weekly Status Update

(11/15) Team Weekly Status Update

This week we made a push to get all of the major components of our MVP ready. We wanted to have the hub server be able to take connections from both a wearable device and a button. Since our MVP did not require the integration