Accomplishment

  1. Print out LED, Radar, Switch, Battery, Display casing and test fit
    • Need update design for bolt joints (4h)
  2. Finish all cad, electrical wire holes sizes are subject to be fine tune base on final electrical wiring. (6h)
  3. Interm Demo (2h)

Schedule 

  1. Finish final print for Radar LED assembly and button enclosure
  2. Need to finish Print for battery, pi, screen (delayed)

Plan for Next week

  1. Update battery, pi, screen CAD for cable size
  2. Finish final prints.