Johnny Tian’s Status Report Mar. 16th

Accomplishment

  1. Ethics (4h)
  2. CAD designs(8h)
    • Turns Switch Cad V1
    • Led Cad V1
    • Pi V1

Schedule 

  1. CAD (Partial Finish, still need battery)

Next Week Plan 

  1. Battery Cad
  2. Refine all Cad
  3. Turn switch electrical section

Document

Switch Cad V1

Led Cad V1