This week, our overall status remains largely the same as last week. We have continued to experience shipping delays that are limiting our ability to move forward with subsystem testing. At this point, our primary bottleneck is still the arrival of a few key components required for full electrical integration. In the meantime, we have shifted our focus toward documentation and have been primarily working on completing and refining our formal design report.
Because we are still waiting on parts, we have not made major progress in hardware validation. However, we are using this time productively to ensure our documentation is thorough, technically consistent, and aligned with our implementation plans. This will allow us to transition smoothly back into hands-on testing once all components arrive.
We did not make any major changes to our system architecture or incur new costs this week. We received mostly positive feedback from our design review presentation, and as a result, we have continued forward with a design report that closely mirrors our presented architecture and justification. At this time, we do not anticipate significant structural changes to the system and will proceed with implementation as planned once testing can begin.
For product solution answers, A was written by Andrew, B was written by Steven, and C was written by Kendric.