Team’s Status Report for 4/20

What are the most significant risks that could jeopardize the success of theĀ project? How are these risks being managed? What contingency plans are ready?

There are no more significant risks that are facing us in the project. Earlier this week the system was able to be tested with a single camera node sending to the central node and we were able to get a good output on the monitor. Along with the validated range by testing in an outdoor situation and timing plots from the logic analyzer we now have good coverage on all of the potential areas that were of concern. All that is left to do is to integrate the stream addressing system with the FPGA. The addressing system was already integrated when we did all the testing so it is just making sure that the details are sorted out

Video of system working end to end: https://drive.google.com/file/d/1vU1QA5X1gf_H7oJ-TFqDhKXAVMIMwOnm/view?usp=sharing