Corrado Govea’s Status Report for April 20th

This week’s accomplishments

  • Spent many hours debugging the HV and LV circuits this week with Elijah!
    • Assembled, probed, integrated and tested the HV power management PCB to control the heating element, with passing test results.
    • Integrated the DC pump with the new power mosfet.
      • Identified an issue with the circuit, where we were providing 5V to power the pump, but didn’t realize that there was also a voltage drop across the MOSFET:
        • (1ohm) * (2A) = 2V drop across MOSFET.
          • Solution: Increased DC supply to be 7V (5V pump + 2V MOSFET)
    • Completed testing for pouring water and for heating water with the team.
    • Worked on final presentation.

Next Week’s Deliverables

  • Continue integrating all systems and complete remaining testing.
  • Ensure stability of new pump circuit, tune circuit by ensuring that gate current limiting resistor and gate discharge resistor values are appropriate through further testing.
  • Add safety features to the gantry: cover to protect users from boiling water, securing all LV and power electronics to the gantry.

Status Report: On Schedule

Leave a Reply