Elijah Knupp’s status report for April 20th

This week’s accomplishments

  • Attended mandatory labs
  • To account for a drifting issue with the scale, added an automatic taring feature
  • Created slides for the final presentation
    • specifically, slides that corelated to the tests performed
  • Troubleshot the pump circuit for over 12 hours. The issue was with amount of voltage supplied to the circuit. Although this was a simple solution, there were several red herrings that lead to the long troubleshooting process. Ultimately, to solve this issue, we:
    • Consulted with 5 different individuals
    • Ran a plethora of troubleshooting tests
    • Ordered several sets of MOSFETS
    • Continually swapped out components
    • Tweaked and rebuilt the circuit several times

Next weeks plan

  • Perform the necessary tests for the pump and heater
  • Integrate all of the components together into one working project.
  • Finalize the slides for final presentation

Status Report: On schedule