Xiao’s Weekly Status Update (04/29)

My task this week is the testing of all the metrics of our design. Since I am responsible for the integration, and I have the device, I am mostly responsible for actually doing the testing and gathering the data, while my team mates are responsible for designing the tests. We have met our design goals in some areas, such as gyro drift limit and battery life. However, some metrics such as weight and gyro oscillation are not as fine-tuned as we would like.

Videos and pictures of testing results are in the Team’s Status Report.

We are on track. Test data is ready to be incorporated into the final report.