What are the most significant risks that could jeopardize the success of the project? How are these risks being managed? What contingency plans are ready?
The most significant risk right now remains the same — if the windowed time series analysis turns out to be inaccurate. As described last week, if this doesn’t work, we plan to incorporate more rigorous calibration into the system or possibly restructure the gestures so that they are more distinct from each other. Additionally, we could resort to the neural network approach, although this is the less ideal case because it will likely have a performance penalty and may not necessarily have better accuracy.
Were any changes made to the existing design of the system (requirements, block diagram, system spec, etc)? Why was this change necessary, what costs does the change incur, and how will these costs be mitigated going forward?
None since last week.
Provide an updated schedule if changes have occurred
Team work adjustments
No teamwork adjustments have been made. We are currently on track to accomplish our tasks and are currently all just working on them.