This week I was mostly working on our team’s proposal presentation slides. Our project is still in the early stages, so I also went ahead and polished some of our preliminary ideas so that we could design our project in a much more modular fashion.

This includes: attaching white LED lights around our mirror to fix the variable of minimizing shadows for each of our users, being able to analyze solid colors, having a tag to each of the clothes that the user fills out to make it easier to grab the correct matching clothes from the database.

In doing so, we were able to set an MVP for our project. I believe our project is on schedule, but we should be aware of the possible complications that could come from a new tech stack. Next week, I hope to be able to test out some of the software tools that our team is planning to use for the color detection and come up with an overall design strategy for our project by deciding on which tools we plan to utilize.

Leave a Reply

Your email address will not be published. Required fields are marked *