Author: apeprah

Angel’s Status Report for 2/19

Angel’s Status Report for 2/19

This week I worked with the team to create our design proposal slides and prepare for the presentation. We also incorporated feedback from the proposal presentations. This included tweaking some of our requirements such as the latency, which I believe can be less than half 

Angel’s Status Report for 2/12

Angel’s Status Report for 2/12

Over the past week I helped finish the slides for the design report and also attended various meetings (both after presentations and outside of class) to discuss the feedback we got after presentations and to more fully develop our design for the flute controller. I