Harper’s Status Report for 4/24

This week was focused around integration. Because I was able to make a trip to Pittsburgh, I brought with me the materials I had assembled to get the load cell to work with calibrated readings. I then worked with Stefan to integrate that into the LCD and enclosure.

Leave a Reply

Your email address will not be published. Required fields are marked *