Team Status Report for 03/27/2021

This week, we have almost finalized all of our project. We are on our track to integrate two weeks later. Michael was able to almost finalize his hardware code to generate all the valid moves. Joseph was able to work on the background subtraction algorithm and will integrate next week. Jee Woong made progress on the board detection, and now we are able to find the coordinates of the pieces.  Next week, Joseph is going to coordinate with what Jee Woong wrote to build a chess system that represents the board state as well as detect moves.

All the team members are on track with the gantt chart. We are on schedule, and with this progress, we might have something to show for next week to be ready for the interim demo.