Team – Week 3 Status Report

What are the most significant risks that could jeopardize the success of the project?
For this week, the most significant risk found was whether or not the filtering techniques being used were efficient enough to classify the sound data. After classification, if the results are bad, then it could either be a problem with our classification method or our filtering method not being good enough.
How are these risks being managed? What contingency plans are ready?
Eri and Ryan are meeting frequently and working on everything together for classification once again. There are certain errors such as the CNN not reaching a final accuracy rating that points to the structure of the CNN not being good for the data being inputted.
Were any changes made to the existing design of the system (requirements, block diagram, system spec, etc)? Why was this change necessary, what costs does the change incur, and how will these costs be mitigated going forward?
We did not make any changes to the requirements/block diagram/system spec this week.
Provide an updated schedule if changes have occurred.
There have been no changes.