What are the most significant risks that could jeopardize the success of the project?
The biggest risk this week is if the double blind trials does not perform well (i.e. it does not mimic heart sounds) then we need to think of other ways to test our stethoscope.
How are these risks being managed? What contingency plans are ready?
We individually came up with different ways to mimic heart sounds that we can try in case the speaker with foam does not perform well.
Were any changes made to the existing design of the system (requirements, block diagram, system spec, etc)? Why was this change necessary, what costs does the change incur, and how will these costs be mitigated going forward?
No changes made this week.
Provide an updated schedule if changes have occurred.
No changes made this week