Team Status Report: 10/30

The most significant risk could be how long the hardware is taking to get done. That is, if the tags do not get down, the connection to the software then the web app can take a while, as we have not “ordered” our pcbs. However, we have been working on making the pcb’s ourselves, and have been working on the connection between the software and the webapp and have that pipeline done. We’re making sure to get the rest of the pipeline done (and we have) so that as soon as the pcb’s are finalized and done, we will be ready to test them.

The most we have changed is that the user now has an option to poll the tags for information. We have already figured this out, and have made it so that the web app calls the software to poll. That way it can handle both the default case (2 times a day) and when the user asks.

There hasn’t been significant changes to the schedule.

We have all been hard at work at our own parts. Tarush has finished login and registration for the user, MeeDm has finished up the connection between the webapp and the software part of the tags as well as connecting to the tags and getting information, and Lucas has the pcb’s mostly printed and we are just working on putting the components on them.

Leave a Reply

Your email address will not be published. Required fields are marked *