Author CallumPosted on April 27, 2024No comment Callum’s Status Report for 04/27

Callum’s Status Report for 04/27

This Week: Troubleshooted the sensor matrix with Anirud Tested using a standalone power source for the matrix rails (we found that we were current limited by the Arduino 5V pin) … Read More “Callum’s Status Report for 04/27”

Author aduraniPosted on April 27, 2024April 27, 2024No comment Anirud’s Status Report for 04/27

Anirud’s Status Report for 04/27

This week: I encountered several challenges while debugging the Sensor Matrix. After identifying and fixing a short in the mux-select lines and re-wiring, I individually tested all the PCBs, which … Read More “Anirud’s Status Report for 04/27”

Author LucaPosted on April 27, 2024April 27, 2024No comment Team Status Report for 4/27

Team Status Report for 4/27

Current Risks: More problems arise upon integration of all project modules Catastrophic failure of a component or set of components before demo Damage to PCBs or Arduino’s during capacitor soldering … Read More “Team Status Report for 4/27”

Author LucaPosted on April 27, 2024April 27, 2024No comment Luca’s Status Report for 4/27

Luca’s Status Report for 4/27

This Week: This week I put the finishing touches on the gantry. This mainly included laser cutting wood and attaching it to the frame. While this sounds trivial at worst, … Read More “Luca’s Status Report for 4/27”

Author CallumPosted on April 21, 2024No comment Callum’s Status Report for 4/20

Callum’s Status Report for 4/20

This Week: Debugging and troubleshooting: Lots of it. This week, Anirud and I encountered significant problems with reading Arduino values. After wiring and rewiring, many of these problems were solved … Read More “Callum’s Status Report for 4/20”

Author aduraniPosted on April 20, 2024No comment Anirud’s Status Report for 4/20

Anirud’s Status Report for 4/20

This Week: This week, we encountered several challenges with shorts in our connections due to initial wiring issues. After multiple revisions, we’ve successfully improved the setup. The small wires extending … Read More “Anirud’s Status Report for 4/20”

Author LucaPosted on April 20, 2024April 21, 2024No comment Team Status Report for 4/20

Team Status Report for 4/20

Current Risks: Cables aren’t resilient enough and begins shearing. Debugging this would be very difficult as they are long cables. The arduino and other hardware doesn’t fit in the allotted … Read More “Team Status Report for 4/20”

Author LucaPosted on April 20, 2024April 20, 2024No comment Luca’s Status Report for 4/20

Luca’s Status Report for 4/20

This Week: This week, I spent a lot of time printing the (hopefully) last components. This includes both the cable snakes (for routing cables to the moving gantry) and the … Read More “Luca’s Status Report for 4/20”

Author aduraniPosted on April 6, 2024April 6, 2024No comment Team Status Report for 04/06

Team Status Report for 04/06

Significant Risks and Management Strategies: Our primary risks include technical challenges in integration, potential mechanical failures, and ensuring precise control over the moving parts. We are managing these risks through … Read More “Team Status Report for 04/06”

Author CallumPosted on April 6, 2024No comment Callum’s Status Report for 04/06

Callum’s Status Report for 04/06

This Week: Bundled cables for matrix output – this was changed on Wednesday to a hard-wired design with temporary spacers shown below. Soldered PCBs together giving us a much more … Read More “Callum’s Status Report for 04/06”

Posts navigation

Page 1 Page 2 Next page

Pages

  • Design Review
  • Final Project Documents
  • Project Summary
  • Proposal

Archives

  • April 2024
  • March 2024
  • February 2024

Meta

  • Log in
  • Entries RSS
  • Comments RSS
  • WordPress.org
Team A5: Chargin' Proudly powered by WordPress