Weekly Status Reports [Swati]
Swati’s Status Report 10/26
Things accomplished this week I worked more on the CAD design. It ended up taking longer than anticipated since there were nuances of CAD design i was unaware of. Creating the hinge to the correct specification basis back-of-th-napkin calculations was harder than I expected. However, having done and verified the Read more…