Team Status Report 10/26

Summary We made progress over the last week on multiple fronts: The server was dockerized and a production and docker variant of the container was created. A basic version of authentication was formally decided on as an MVP. The YOLO model was tested via new validation scripts and was ensured Read more…

By emuchnik, 7 months7 months ago
Weekly Status Reports [Ethan]

Ethan’s Status Report 10/26

What did you personally accomplish this week on the project? Further Yolo Testing This week I added in various Scripts and functions aimed at robustly testing each YOLO test configuration. While there was iterative testing before, now it was far more clear to see the data from each run and Read more…

By emuchnik, 7 months7 months ago
Presentations and Reports

Design Review Report

This report documents some of design decisions and rationale involved in the initial-to-intermediate phases of our project. Team_A7_Zaniolo_Muchnik_Anshu_design DESIGN_REPORT

By gzaniolo, 7 months ago
Weekly Status Reports [Giancarlo]

Giancarlo’s Status Report for 10/26

What did you personally accomplish this week on the project? Dockerize Server A large portion of my work this week involved placing the webserver in a docker container. As discussed in the previous week’s report, this is beneficial for a variety of reasons. Primarily, each of the groupmates are running Read more…

By gzaniolo, 7 months ago
Weekly Status Reports [Swati]

Swati’s Status Report 10/26

Things accomplished this week I worked more on the CAD design. It ended up taking longer than anticipated since there were nuances of CAD design i was unaware of. Creating the hinge to the correct specification basis back-of-th-napkin calculations was harder than I expected. However, having done and verified the Read more…

By sanshu, 7 months7 months ago
Weekly Status Reports [Giancarlo]

Giancarlo’s Status Report for 10/20

What did you personally accomplish this week on the project? Design report A substantial portion of the week’s work involved creating the design presentation. Our report wound up being longer, and taking longer to write than expected so not much else was done during the week of October 7th. Completed Read more…

By gzaniolo, 7 months ago
Weekly Status Reports [Ethan]

Ethan Muchnik Status Report 10/20

Things accomplished this week This week there was a lot of emphasis on both developing the robustness of the YOLO model with regard to adding new types of objects and integrating said models with the database/web server. Significant progress was made in both areas. With regard to robustness of adding Read more…

By emuchnik, 7 months6 months ago
Weekly Status Reports [Swati]

Swati’s Status Report for 10/20

Things accomplished this week A substantial amount of my time went into working on the design report, researching specific benchmarks and reference metrics. It required an in-depth understanding of the subsystems and the system as a whole and hence we were able to plan and hash out more specifics of Read more…

By sanshu, 7 months7 months ago
Weekly Status Reports [Team]

Team Status report 10/20

Summary We made progress over the last week on multiple fronts: We finished the Design Report for submission with all the necessary specifics that demanded more research, facts and figures to support our arguments regarding the technological applications and rationale behind our design choices. Worked on and successfully deployed the Read more…

By sanshu, 7 months7 months ago
Weekly Status Reports [Team]

Team Status Report 10/5

Summary Our group completed: Planning, creating, and practicing our Design Presentation Finalizing many of our design decisions that were previously up in the air Most importantly was our database choice. We have implemented a dummy version of our local database, but still have to properly figure out how to use Read more…

By gzaniolo, 7 months ago

Posts navigation

1 2 Next
Recent Posts
  • Final Report
  • Video!
  • Poster!
  • Giancarlo’s Status Report for 12/7
  • Team’s Status Report for 12/7
Recent Comments
  • Table of Contents: – Team A7: Forget-Me-Not on Introduction and Project Summary
Archives
  • December 2024
  • November 2024
  • October 2024
  • September 2024
Categories
  • Introduction and Project Summary
  • Presentations and Reports
  • Table of Contents
  • Uncategorized
  • Weekly Status Reports [Ethan]
  • Weekly Status Reports [Giancarlo]
  • Weekly Status Reports [Swati]
  • Weekly Status Reports [Team]
Meta
  • Log in
  • Entries RSS
  • Comments RSS
  • WordPress.org
  • All Blog Posts
  • Front Page
Hestia | Developed by ThemeIsle