Summary
Our group completed the following:
- Working on the final presentation
- Implementing Audio input and output
- Creating audio UI
- Printing CAD designs
- More performance testing
What are the most significant risks that could jeopardize the success of the project? How are these risks being managed? What contingency plans are ready?
None very significant ones currently. Majority of our work is done. The audio integration is the most important now along with the final report submission. Contingency plans are backup Rpi camera case, and a simpler audio UI than the one that is currently being worked upon
Were any changes made to the existing design of the system (requirements, block diagram, system spec, etc)? Why was this change necessary, what costs does the change incur, and how will these costs be mitigated going forward?
No changes made.
Provide an updated schedule if changes have occurred.
No changes – still on track to finish everything as required