Currently, the most significant risks that could jeopardize the success of the project is if our LED doesn’t come in time. To manage this week, we have decided on a backup plan of neopixels since we already have them. Although they may not be as bright as we want them to be, we can combine an array of them to simulate the LED we bought until it arrives. So far, no changes to the design of the system have been made. If we do have to make any changes, we will either make sure that the things we need to purchase for it will arrive quickly, or we will use materials we currently have. No schedule changes have occurred since last week, and we still plan to work on individual components these next two-ish weeks before putting everything together. It doesn’t affect the overall schedule because we had built-in time for unexpected issues.
