Team Status Report for 4/25

This week, our team focused on finalizing both our presentation and key parts of the system. Ella presented our final presentation, and as a group we did a full dry run beforehand to make sure everything was clear and covered all the important points. We also discussed as a team our schedule for the remaining time we have to work on the project.

In terms of overall progress, we’ve successfully tested several subsystems individually, including color mixing,  controller input/output, the focus mechanism, and pan movement. These results show that our core components are working as expected, which puts us in a good position for full integration. However, we still need to integrate the tilt mechanism and run a complete system test to verify everything works together. Moving forward, our main focus as a team is completing integration and performing full system-level testing to ensure reliability.