Team Status Report for 4/18

What are the most significant risks that could jeopardize the success of the project? How are these risks being managed? What contingency plans are ready? 

The main risk to our project at the moment is the failure of the electronics in the mounting of our design. However, since we have successfully mounted one of the glasses, we are confident that the other should go even smoother. One other things that could prove difficult is making sure that everything is clean and readily available for a user to use that may not be as familiar with the project as we are. This involved cleaning up wiring and making sure that nothing will break. We already have plans in place to remedy this as well as contingency plants to simplify the glasses design so that anyone can sue them without much issue. This could be not mounting all of the parts of the glasses because they may not fit everyone’s face.

Were any changes made to the existing design of the system (requirements, block diagram, system spec, etc)? Why was this change necessary, what costs does the change incur, and how will these costs be mitigated going forward?

The only thing that may have changed I have described above, where we may simplify the design for the demo for easy of use, while having one complete system to display what the completed product will look like. This does not have a large cost to the project other than not having a totally completed product like we envisioned for the demo, but makes the demo much ore accessible without having to change the physical design.

Provide an updated schedule if changes have occurred

No changes have been made to the design or our schedule.