Team Status Report for 3/21

The most significant risks to the project are software based. Specifically, we’re worried about whether or not we’ll be able to achieve our desired 2 second latency from user input to result. This week, we’ll try to achieve the latency requirement through lots of work on software. Luckily, if it’s not achievable, we believe that a similar low latency will be possible such as 3 or 4 seconds.

We didn’t make any changes to the system. Instead, we further specified it by including straps and foam for the user’s comfort.

There aren’t any updates to the schedule.