Angel’s Status report for 3/9

The following work was completed between 2/25 – 3/9 (week prior to spring break – end of spring break)

  • Mandatory Labs (4hrs)
  • Individual work (6hrs)
    • Finalized straightaway cardboard prototype with cardboard carrier
    • Attempted to create straightaway cardboard prototype with cardboard carrier
    • Modify CAD design for straightaway track and carrier prototype
  • Design Report (6hrs)
    • Complete Design Trade Studies and System Implementation

Through out the past two week, I have spent time further developing cardboard prototypes for the track and carrier maglev. I attempted to create two prototypes for the straightaway track and carrier. The first involved having a 1-1 relationship between the track magnets and carrier magnet. While this design successfully levitated the carrier, there were issues with stability. In attempt to create a more stable design, I created a prototype with a 2-1 track magnet to carrier magnet ratio. Due to errors with spacing (the track magnets were too far apart on the track), this design created a carrier that was attracted to the space between the track magnets, resulting in no levitation. I plan to reattempt this design with less spacing between the track magnets to see if the system will be more stable.

Also, completing the initial straightway track and carrier from cardboard showed that the spacing in the current CAD design of the straightaway track is too large. The best spacing between ends of a magnet is roughly 3 centimeters. I plan to make modifications to all CAD track designs to meet these specifications.

 

Next Week 

In the following week, I hope to start printing the CAD design for straightaway track and carrier. Secondly, I would like to start working on a prototype for the oval shaped track. Lastly, I would like to start working with the ultrasonic sensor and the hall effect to start to design the start, stop, and speed system.